Ty-Gard · How to use
Demonstration & Training
Each band of Ty-Gard® installs in approximately three minutes. The demonstration is for demo purposes only — for a specific load pattern recommendation, contact us.
Ty-Gard · How to use
Each band of Ty-Gard® installs in approximately three minutes. The demonstration is for demo purposes only — for a specific load pattern recommendation, contact us.
On site or online
A representative walks through the same four steps used on every Ty-Gard band — prepare, load, tension, seal — on site or online. The first bands are installed with your crew, and a load diagram is left behind.
Step by step
Anchor the patches to the sidewall in the predetermined position.
Pull the band across the face of the load, overlapping the ends by about 1 ft (30 cm).
Insert the tensioning tool through the overlap and tension with the wrench.
Seal the tensioned band with a patch and a bonding roller.
Next
A representative installs the first bands with your crew and leaves a load diagram behind.