Ty-Gard · How to use

Installation instructions

Four steps per band: prepare the anchors, load, tension, seal. Each Ty-Gard DS® band takes about three minutes with the Ty-Tool® and a bonding roller.

Step by step

Prepare, load, tension, seal

The same four steps apply to drums, IBCs, FIBCs, pallets and loose cargo. The load plan sets the band position and the number of bands.

  1. 01

    Prepare

    Cut two sections of Ty-Gard DS® and one section of Ty-Patch DS® for each band required. Peel away the release liner and apply the exposed adhesive surface to the sidewall in the predetermined position. Apply pressure with a bonding roller or squeegee.

  2. 02

    Load

    Finish loading the cargo and pull the Ty-Gard DS® strips across the face of the load, overlapping the ends by approximately 1 ft (30 cm).

  3. 03

    Tension

    Insert the Ty-Tool® down through the overlapping bands and place the magnet. Cut excess overlap if necessary. Use the small wrench to tension.

  4. 04

    Seal

    Remove the release liner from the 5 ft length of Ty-Patch and place it across the tensioned Ty-Gard DS® barrier. Apply pressure with a bonding roller or squeegee.

What you need

Materials and tools per band

Everything ships in the kit or from the mobile dispenser; no drilling, nailing or wood blocking.

Ty-Gard DS® bandTwo sections per band, 24" / 61 cm wide
Ty-Patch DS® anchorsOne section per band for the sidewall anchors, plus a 5 ft length to seal the tensioned band
Ty-Tool®Tensioning tool with magnet and small wrench
Bonding roller or squeegeePresses the adhesive onto the sidewall and across the band
Safety cutterTrims excess overlap; the extended cutter removes bands at a distance from shifted cargo

Want to see it done on your cargo?

A representative installs the first bands with your crew and leaves a load diagram behind.